| Parameters |
1
Alkyl Amines Chemicals Limited
|
|
|---|---|---|
| Industry | Chemicals | |
| Product Profile/Sector | Aliphatic Amines, Amine Derivatives, Specialty Chemicals | |
| HO Location | Navi Mumbai, Maharashtra | |
| Factory Locations | Dahej, Gujarat, Patalganga, Maharashtra, Kurkumbh, Maharashtra | |
| Net Zero Target | — | |
| Certifications & Accreditations | ISO 14001, ISO 50001, Responsible Care | |
| Reports | BRSR, GRI | |
| Ratings | — | |
| Profile | View Profile | |
| Parameters |
1
Alkyl Amines Chemicals Limited
|
|
|---|---|---|
| Energy Detail | Company has taken several initiatives at each plant level in order to conserve energy which is in line with the policy of conservation of natural resources along with adoption of solar energy. Company has 3 solar power plants. | |
| Parameters | Year |
1
Alkyl Amines Chemicals Limited
|
|---|---|---|
Renewable Sources |
||
| Electricity | 2024-25 | 38,947GJ |
| 2023-24 | 139,927GJ | |
| Fuel | — | — |
| Other sources | — | — |
| Total Renewable Energy | 2024-25 | 38,947GJ |
| 2023-24 | 139,927GJ | |
Non-Renewable Sources |
||
| Electricity | 2024-25 | 105,940GJ |
| Fuel | 2024-25 | 2,608,164GJ |
| 2023-24 | 2,448,060GJ | |
| Other sources | — | — |
| Total Non-Renewable Energy | 2024-25 | 2,714,104GJ |
| 2023-24 | 2,448,060GJ | |
| Total Energy Consumed | 2024-25 | 2,753,051GJ |
| 2023-24 | 2,587,987GJ | |
| Renewable Power % | 2024-25 | 1.414% |
| 2023-24 | 5.04% | |
Intensity Metrics |
||
| Per ₹ of turnover | 2024-25 | 0.17GJ/1000 INR turnover |
| 2023-24 | 0.2GJ/1000 INR turnover | |
| In terms of physical output | 2024-25 | 8GJ/MT output |
| 2023-24 | 16GJ/MT output | |
| Parameters |
1
Alkyl Amines Chemicals Limited
|
|
|---|---|---|
| Water Detail | Reduce water withdraw by 15% per ton of production up to March, 2026 (5.51 KL/MT). The Company has reached to 4.35 KL/MT by the end of this financial year from 6.9 KL/MT during 2019-20, meeting its set target ahead of time. Water recycling improved significantly from 7.23% in 2023-24 to 13.09% in 2024-25. | |
| Parameters | Year |
1
Alkyl Amines Chemicals Limited
|
|---|---|---|
Source |
||
| Surface water | — | — |
| Groundwater | — | — |
| Purchased water | 2024-25 | 771,103KL |
| 2023-24 | 815,822KL | |
| Seawater/desalinated water | — | — |
| Other sources | 2024-25 | 116,666KL |
| Total Water Withdrawal | 2024-25 | 771,103KL |
| 2023-24 | 815,822KL | |
| Consumption | 2024-25 | 8,87,069KL |
| 2023-24 | 8,74,346KL | |
Water Discharged |
||
| Surface water | ||
| No treatment | — | — |
| With treatment | — | — |
| Groundwater | ||
| No treatment | — | — |
| With treatment | — | — |
| Seawater | ||
| No treatment | — | — |
| With treatment | — | — |
| Sent to third parties | ||
| No treatment | — | — |
| With treatment | — | — |
| Other channels | ||
| No treatment | — | — |
| With treatment | 2023-24 | 1,09,552KL |
| Total Water Discharged | 2024-25 | 91,997KL |
| 2023-24 | 1,09,552KL | |
| % Replacement of Consumption | — | — |
Intensity Metrics |
||
| Per ₹ of turnover | 2024-25 | 0.05KL/1000 INR turnover |
| 2023-24 | 50KL/1000 INR turnover | |
| In terms of physical output | 2024-25 | 2.5KL/MT output |
| 2023-24 | 4.96KL/MT output | |
| Parameters |
1
Alkyl Amines Chemicals Limited
|
|
|---|---|---|
| Waste Detail | Up until March 2026, increase the intensity of recycling hazardous waste by 20% (1.39 kg/MT). Additionally, it met its predetermined goal ahead of schedule by reaching 0.0007 kg/MT at the conclusion of this fiscal year from 1.16 kg/MT during 2019–20. | |
| Parameters | Year |
1
Alkyl Amines Chemicals Limited
|
|---|---|---|
Waste Generated |
||
| Plastic waste | 2024-25 | 86.12MT |
| 2023-24 | 0.341MT | |
| E-waste | 2023-24 | 0.2MT |
| Biomedical waste | 2024-25 | 0.006MT |
| 2023-24 | 0.01MT | |
| Construction waste | 2023-24 | 203MT |
| Battery waste | 2024-25 | 0.648MT |
| 2023-24 | 0.757MT | |
| Radioactive waste | — | — |
| Other Hazardous waste | 2024-25 | 1257.58MT |
| 2023-24 | 1862MT | |
| Other Non-Hazardous waste | 2024-25 | 12784MT |
| 2023-24 | 14033MT | |
| Total Waste Generated | 2024-25 | 14128.354MT |
| 2023-24 | 16099.308MT | |
Waste Recovered |
||
| Plastic waste | ||
| Recycled | — | — |
| Re-used | — | — |
| Other | — | — |
| E-waste | ||
| Recycled | — | — |
| Re-used | — | — |
| Other | — | — |
| Biomedical waste | ||
| Recycled | — | — |
| Re-used | — | — |
| Other | — | — |
| Construction waste | ||
| Recycled | — | — |
| Re-used | — | — |
| Other | — | — |
| Battery waste | ||
| Recycled | — | — |
| Re-used | — | — |
| Other | — | — |
| Radioactive waste | ||
| Recycled | — | — |
| Re-used | — | — |
| Other | — | — |
| Other Hazardous waste | ||
| Recycled | — | — |
| Re-used | — | — |
| Other | — | — |
| Other Non-Hazardous waste | ||
| Recycled | — | — |
| Re-used | — | — |
| Other | — | — |
| Total Waste Recovered | ||
| Recycled | 2024-25 | 13,053MT |
| 2023-24 | 13,958MT | |
| Re-used | 2024-25 | 86.12MT |
| Other | — | — |
| Total Waste Recovered | 2024-25 | 13,139MT |
| 2023-24 | 13,958MT | |
Waste Disposed |
||
| Plastic waste | ||
| Incineration | — | — |
| Landfilling | — | — |
| Other | — | — |
| E-waste | ||
| Incineration | — | — |
| Landfilling | — | — |
| Other | — | — |
| Biomedical waste | ||
| Incineration | — | — |
| Landfilling | — | — |
| Other | — | — |
| Construction waste | ||
| Incineration | — | — |
| Landfilling | — | — |
| Other | — | — |
| Battery waste | ||
| Incineration | — | — |
| Landfilling | — | — |
| Other | — | — |
| Radioactive waste | ||
| Incineration | — | — |
| Landfilling | — | — |
| Other | — | — |
| Other Hazardous waste | ||
| Incineration | — | — |
| Landfilling | — | — |
| Other | — | — |
| Other Non-Hazardous waste | ||
| Incineration | — | — |
| Landfilling | — | — |
| Other | — | — |
| Total waste disposed | ||
| Incineration | 2024-25 | 1,110MT |
| 2023-24 | 1,547MT | |
| Landfilling | 2024-25 | 558MT |
| 2023-24 | 391MT | |
| Other | — | — |
| Total waste disposed | — | — |
Intensity Metrics |
||
| Per ₹ of turnover | 2024-25 | 9MT/Cr INR turnover |
| 2023-24 | 11MT/Cr INR turnover | |
| In terms of physical output | — | — |
| Parameters |
1
Alkyl Amines Chemicals Limited
|
|
|---|---|---|
| Emission Detail | Investment to lower non-renewable energy and time cycle and process parameter optimization. Additionally, green chemistry, chemicals, and carbon dioxide capture are being worked on. | |
| Parameters | Year |
1
Alkyl Amines Chemicals Limited
|
|---|---|---|
| Scope 1 | 2024-25 | 360,680tCO₂e |
| 2023-24 | 353,846tCO₂e | |
| Scope 2 | 2024-25 | 24,352MTCO₂e |
| 2023-24 | 32,261MTCO₂e | |
| Scope 3 | 2024-25 | 293,070MTCO₂e |
| 2023-24 | 253378MTCO₂e | |
Intensity Metrics |
||
| Scope 1 + 2 per ₹ of turnover | 2024-25 | 0.000054Scope 1+2 tCO₂e/INR turnover |
| 2023-24 | 2.41Scope 1+2 tCO₂e/INR turnover | |
| Scope 1 + 2 per unit of physical output | 2024-25 | 2.18Scope 1+2 tCO2e/MT output |
| 2023-24 | 0.425Scope 1+2 tCO2e/MT output | |
| Scope 3 per ₹ of turnover | 2024-25 | 0.000018Scope 3 tCO₂e/INR |
| 2023-24 | 1.58Scope 3 tCO₂e/INR | |
| Scope 3 per unit of physical output | — | — |
Air Pollutants |
||
| NOx | 2024-25 | 19µg/m3 |
| 2023-24 | 27µg/m3 | |
| SOx | 2024-25 | 21µg/m3 |
| 2023-24 | 19µg/m3 | |
| Particulate Matter | 2024-25 | 77µg/m3 |
| 2023-24 | 70µg/m3 | |
| Persistent Organic Pollutants | — | — |
| Volatile Organic Compounds | 2024-25 | 1.24ppm |
| 2023-24 | 4.3ppm | |
| Hazardous Air Pollutants | — | — |
| Parameters |
1
Alkyl Amines Chemicals Limited
|
|
|---|---|---|
| CSR for Climate Action | The goal of Alkyl Amines is to have a zero operating footprint. They have coordinated a number of projects that include solar energy, tree plantations, excavation, restoration and cleaning of water bodies, and water conservation. | |
| Parameters | Year |
1
Alkyl Amines Chemicals Limited
|
|---|---|---|
| CSR Budget | 2024-25 | 5.5011Cr INR |
| 2023-24 | 6.8039Cr INR |
| Parameters |
1
Alkyl Amines Chemicals Limited
|
|
|---|---|---|
| Product Stewardship | By 2030, the business is to finish the Life Cycle Assessment (LCA) studies for twelve high-risk goods. By this fiscal year, the corporation has finished the life cycle assessment (LCA) of every high-risk product from the first LCA conducted in 2019–20. The business has already achieved the goal. Additionally, the company has conducted research and development to employ recycled materials through ongoing process re-engineering. | |
| Parameters |
1
Alkyl Amines Chemicals Limited
|
|
|---|---|---|
| Natural Capital | Plantation of trees both inside and outside the factory grounds . The unit has created a 94,731 m2 green belt at Kurkumbh and planted more than 17,342 different plant types. In Dahej, the unit has created a green belt on 22,000 m2 of land within the plot and leased an adjacent piece of property from GIDC to create a greenbelt on 35,622 m2 and about 6,768 different species of trees planted. The unit in Patalganga has created a 5,010 m2 green belt within the plot and planted more than 203 different plant types. | |