Penguin International Limited Approved
Preview
Detailed
Industry Agriculture, Biomimicry
Product Profile/Sector Parachute Coconut Oil, Parachute Advansed Body Lotion, Saffola, Hair & Care etc.,
HO Location Mumbai, india
Factory Locations Mumbai
Net Zero Target 2040
Certifications & Accreditations ISO 14001, ISO 50001
Reports BRSR, GRI
Ratings CRISIL, CDP-B, DJSI, Sustainalytics
CIRCULARITY IN OPERATIONS
ENERGY

Company has taken several initiatives at each plant level in order to conserve energy which is in line with the policy of conservation of natural resources along with adoption of solar energy. Company has 3 solar power plants.

Initiative Undertaken Details Outcome
Energy conservation initiatives were implemented across the Kurkumbh, Patalganga, and Dahej plants through a range of electrical and thermal efficiency projects. Initiatives included energy-efficient fans, VFD installations, lighting automation and solar lighting, optimization of cooling towers and compressors, motor right-sizing, heat integration, steam optimization to enhance turbine power generation, and water recycling Reduce steam and power use, resulting in improved
Replace non - renewable energy to renewable energy. Installation of solar power plants at Maharashtra and Gujarat More than three times use of renewable energy
Unit 2024-25 2023-24 2022-23
Renewable Sources
Electricity GJ 5,000.00 3,000.00 1,000.00
Fuel GJ 4,200.00 5,000.00 -
Other sources GJ 4,000.00 300.00 -
Total Renewable Energy GJ 57,015.07 200.00 -
Non-Renewable Sources
Electricity GJ 500.00 400.00 -
Total Non-Renewable Energy GJ 1,783,632.00 123,456.00 -
Total Energy Consumed GJ 17,616,220.00 121,521.00 -
Renewable Power % % 25.00 20.00 -
Intensity Metrics
GJ/Cr INR turnover GJ/Cr INR turnover 5.00 - -
GJ/MT output GJ/MT output 5.00 - -
WATER

Reduce water withdraw by 15% per ton of production up to March, 2026 (5.51 KL/MT). The Company has reached to 4.35 KL/MT by the end of this financial year from 6.9 KL/MT during 2019-20, meeting its set target ahead of time. Water recycling improved significantly from 7.23% in 2023-24 to 13.09% in 2024-25.

Initiative Undertaken Detail Outcome
Reduction of utility consumption by recycling water without stripping column Recycled water in Methyl Amine plant without running the stripping column at Dahej plant. Bypassed energy-intensive stripping to reuse treated water directly. Cut steam and power usage for stripping operations, enabling resource savings without production impact.
Cut steam and power usage for stripping operations, enabling resource savings without production impact. Cut steam and power usage for stripping operations, enabling resource savings without production impact. Cut steam and power usage for stripping operations, enabling resource savings without production impact.
Unit 2024-25 2023-24 2022-23
Source
Surface water KL 88,000.00 78,000.00 -
Groundwater KL 45,000.00 40,000.00 -
Total Water Withdrawal KL 150,000.00 100,000.00 -
Consumption KL 150,000.00 100,000.00 -
Water Discharged
Surface water
No treatment KL 10,000.00 - -
Total Water Discharged KL 50,000.00 - -
% Replacement of Consumption % 0.00 - -
Intensity Metrics
KL/Cr INR KL/Cr INR 500.00 - -
KL/MT output KL/MT output 400.00 - -
WASTE

Reduce water withdraw by 15% per ton of production up to March, 2026 (5.51 KL/MT). The Company has reached to 4.35 KL/MT by the end of this financial year from 6.9 KL/MT during 2019-20, meeting its set target ahead of time. Water recycling improved significantly from 7.23% in 2023-24 to 13.09% in 2024-25.

Initiative Undertaken Detail Outcome
The Company has reached to 4.35 KL/MT by the end of this financial year from 6.9 KL/MT during 2019-20, meeting its set target ahead of time. Water recycling improved significantly from 7.23% in 2023-24 to 13.09% in 2024-25. The Company has reached to 4.35 KL/MT by the end of this financial year from 6.9 KL/MT during 2019-20, meeting its set target ahead of time. Water recycling improved significantly from 7.23% in 2023-24 to 13.09% The Company has reached to 4.35 KL/MT by the end of this financial year from 6.9 KL/MT during 2019-20, meeting its set target ahead of time.
Unit 2024-25 2023-24 2022-23
Waste Generated
Plastic waste MT 456.00 452.00 -
E-waste MT 45.00 - -
Biomedical waste MT 40.00 45.00 -
Total Waste Generated MT 458.00 700.00 -
Waste Recovered
Total Waste Recovered
Recycled MT 45.00 46.00 -
Re-used MT 48.00 78.00 -
Total Waste Recovered MT 98.00 100.00 -
Waste Disposed
Total waste disposed
Incineration MT 45.00 46.00 -
Landfilling MT 46.00 41.00 -
Intensity Metrics
MT/Cr INR MT/Cr INR 2.36 5.60 -
MT/MT MT/MT 4.65 4.56 -
EMISSIONS

Reduce water withdraw by 15% per ton of production up to March, 2026 (5.51 KL/MT). The Company has reached to 4.35 KL/MT by the end of this financial year from 6.9 KL/MT during 2019-20, meeting its set target ahead of time. Water recycling improved significantly from 7.23% in 2023-24 to 13.09% in 2024-25.

Initiative Undertaken Detail Outcome
Reduction in Greenhouse Gases OCEMS were installed and connected to coal-fired boilers at Dahej, Kurkumbh, and Patalganga plants, with systems at Dahej linked directly to GPCB and CPCB portals for real-time data transmission, ensuring continuous monitoring and regulatory compliance across all sites. Reduction in emissions of SOx Online Continuous Emission Monitoring Systems (OCEMS) OCEMS were
Reduction in emissions of SOx Online Continuous Emission Monitoring Systems (OCEMS)OCEMS were installed a Reduction in emissions of SOx Online Continuous Emission Monitoring Systems (OCEMS) OCEMS were installed a Reduction in emissions of SOx Online Continuous Emission Monitoring Systems (OCEMS) OCEMS were installed a
Unit 2024-25 2023-24 2022-23
Scope 1 MTCO2e 87,435.00 78,000.35 -
Scope 2 MTCO2e 9,712.00 9,856.00 -
Scope 3 MTCO2e 78,400.00 77,894.23 -
Intensity Metrics
tco2e/Cr INR tco2e/Cr INR 456.00 452.00 -
tco2e/MT tco2e/MT 45.23 42.56 -
tco2e/Cr INR tco2e/Cr INR 42.23 45.23 -
tco2e/MT tco2e/MT 78.00 47.00 -
Air Pollutants
NOx (MT) MT 78.00 87.00 -
SOx (ppm) ppm 75.00 45.00 -
PRODUCT STEWARDSHIP

The goal of Alkyl Amines is to have a zero operating footprint. They have coordinated a number of projects that include solar energy, tree plantations, excavation, restoration and cleaning of water bodies, and water conservation.

NATURAL CAPITAL

Reduce water withdraw by 15% per ton of production up to March, 2026 (5.51 KL/MT). The Company has reached to 4.35 KL/MT by the end of this financial year from 6.9 KL/MT during 2019-20, meeting its set target ahead of time. Water recycling improved significantly from 7.23% in 2023-24 to 13.09% in 2024-25.

CSR FOR CLIMATE ACTION

Reduce water withdraw by 15% per ton of production up to March, 2026 (5.51 KL/MT). The Company has reached to 4.35 KL/MT by the end of this financial year from 6.9 KL/MT during 2019-20, meeting its set target ahead of time. Water recycling improved significantly from 7.23% in 2023-24 to 13.09% in 2024-25.

Initiative Undertaken Detail Outcome
The goal of Alkyl Amines is to have a zero operating footprint. They have coordinated a number of projects that include solar energy, tree plantations, excavation, restoration and cleaning of water bodies, and water conservation. The goal of Alkyl Amines is to have a zero operating footprint. They have coordinated a number of projects that include solar energy, tree plantations, excavation, restoratio The goal of Alkyl Amines is to have a zero operating footprint. They have coordinated a number of projects that include ter conservation.
Unit - Cr INR Unit 2024-25 2023-24 2022-23
CSR Budget Cr INR 4.00 7.00 -