Alkyl Amines Chemicals Limited
Industry Chemicals
Product Profile/Sector Aliphatic Amines, Amine Derivatives, Specialty Chemicals
HO Location Navi Mumbai, Maharashtra
Factory Locations Dahej, Gujarat
Patalganga, Maharashtra
Kurkumbh, Maharashtra
Certifications & Accreditations ISO 14001, ISO 50001, Responsible Care
Reports BRSR, GRI
CIRCULARITY IN OPERATIONS
ENERGY

Company has taken several initiatives at each plant level in order to conserve energy which is in line with the policy of conservation of natural resources along with adoption of solar energy. Company has 3 solar power plants.

Initiative Undertaken Details Outcome
Energy conservation initiatives were implemented across the Kurkumbh, Patalganga, and Dahej plants through a range of electrical and thermal efficiency projects. Through equipment upgrades, process optimization, and energy recovery. Initiatives included energy-efficient fans, VFD installations, lighting automation and solar lighting, optimization of cooling towers and compressors, motor right-sizing, heat integration, steam optimization to enhance turbine power generation, and water recycling. Reduce steam and power use, resulting in improved overall energy efficiency across all sites.
Replace non - renewable energy to renewable energy. Installation of solar power plants at Maharashtra and Gujarat More than three times use of renewable energy
Increased its renewable energy share 300% more than existing solar energy generation by March, 2026 (8MW) Commissioned 3.5 MW plant in Gujarat in 2024-25. With the commissioning of the 3.5 MW solar plant by the end of financial year, the Company has reached to 8.5 MW capacity against 2 MW during 2019-20, meeting its set target ahead of time.
Unit - GJ Unit 2024-25 2023-24 2022-23
From Renewable Sources
Electricity consumption GJ 38,947.00 139,927.00 -
Total renewable energy consumption GJ 38,947.00 139,927.00 -
From Non-Renewable Sources
Electricity consumption GJ 105,940.00 - -
Fuel consumption GJ 2,608,164.00 2,448,060.00 -
Total non-renewable energy consumption GJ 2,714,104.00 2,448,060.00 -
Total energy consumption GJ 2,753,051.00 2,587,987.00 -
Renewable power % of total % 1.41 5.04 -
Energy Intensity Metrics
GJ/1000 INR turnover GJ/1000 INR turnover 0.17 0.20 -
GJ/MT output GJ/MT output 8.00 16.00 -
WATER

Reduce water withdraw by 15% per ton of production up to March, 2026 (5.51 KL/MT). The Company has reached to 4.35 KL/MT by the end of this financial year from 6.9 KL/MT during 2019-20, meeting its set target ahead of time. Water recycling improved significantly from 7.23% in 2023-24 to 13.09% in 2024-25.

Initiative Undertaken Detail Outcome
Reduction of utility consumption by recycling water without stripping column Recycled water in Methyl Amine plant without running the stripping column at Dahej plant. Bypassed energy-intensive stripping to reuse treated water directly. Cut steam and power usage for stripping operations, enabling resource savings without production impact.
Integrated Effluent Treatment Plants with primary, secondary, and tertiary treatments Installed multi-stage ETPs across sites featuring primary clarification, secondary biological treatment, and tertiary polishing to meet outlet standards. Continuous monitoring ensures parameters stay within prescribed limits. Maintained effluent quality within regulatory limits, minimizing environmental discharge risks.
Recycling 50% of effluent at Kurkumbh via RO/MEE Added Reverse Osmosis (RO) and Multi Effect Evaporator (MEE) systems at Kurkumbh to treat and recycle 50% of generated effluent back into process use. Concentrates handled for safe disposal. Achieved 50% effluent recycling, aligning with prior gains from 7.23% in 2023-24 to 13.09% in 2024-25, boosting water efficiency
Using STP water for gardening Repurposed entire output from Sewage Treatment Plants for on-site gardening and greenbelt maintenance. Treated sewage meets reuse standards post-filtration. Maximized water reuse for non-process applications, supporting sustainability without fresh water draw.
Unit - KL Unit 2024-25 2023-24 2022-23
Water Withdrawal by Source
Third-party water KL 771,103.00 815,822.00 -
Others KL 116,666.00 - -
Total volume of water withdrawal KL 771,103.00 815,822.00 -
Total volume of water consumption KL 887,069.00 874,346.00 -
Water Discharge by Channel and Level of Treatment
Others
ii. With treatment KL - 109,552.00 -
Total water discharged KL 91,997.00 109,552.00 -
Water Intensity Metrics
KL/1000 INR turnover KL/1000 INR turnover 0.05 50.00 -
KL/MT output KL/MT output 2.50 4.96 -
WASTE

Up until March 2026, increase the intensity of recycling hazardous waste by 20% (1.39 kg/MT). Additionally, it met its predetermined goal ahead of schedule by reaching 0.0007 kg/MT at the conclusion of this fiscal year from 1.16 kg/MT during 2019–20.

Initiative Undertaken Detail Outcome
Plastic waste (including packaging) re-use Processed 85.120 tons in FY 2024-25 versus 0.341 tons in FY 2023-24. Increased re-use volume significantly from prior year levels
Hazardous waste re-use and disposal Re-used 286 tons and disposed 12.785 tons safely in FY 2024-25; prior year re-use was 200 tons with 315 tons disposed Boosted re-use by 86 tons while introducing targeted safe disposal
Other waste re-use and disposal Re-used 1.687 tons and disposed 315 tons safely in FY 2024-25; prior year re-use was 0.340 tons with 315 tons disposed. Quadrupled re-use volume while maintaining consistent disposal.
Unit - MT Unit 2024-25 2023-24 2022-23
Waste Generated
Plastic waste MT 86.12 0.34 -
E-waste MT - 0.20 -
Biomedical waste MT 0.01 0.01 -
Construction waste MT - 203.00 -
Battery waste MT 0.65 0.76 -
Hazardous waste MT 1,257.58 1,862.00 -
Non-hazardous waste MT 12,784.00 14,033.00 -
Total waste generated MT 14,128.35 16,099.31 -
Waste Recovered
Total waste recovered
i. Recycled MT 13,053.00 13,958.00 -
ii. Re-used MT 86.12 - -
Total MT 13,139.00 13,958.00 -
Waste Disposed by Nature of Disposal Method
Total waste disposed
i. Incineration MT 1,110.00 1,547.00 -
ii. Landfilling MT 558.00 391.00 -
Waste Intensity Metrics
MT/Cr INR turnover MT/Cr INR turnover 9.00 11.00 -
EMISSIONS

Investment to lower non-renewable energy and time cycle and process parameter optimization. Additionally, green chemistry, chemicals, and carbon dioxide capture are being worked on.

Initiative Undertaken Detail Outcome
Reduction in Greenhouse Gases Replaced FO with LSHS Reduction in emissions of SOx
Online Continuous Emission Monitoring Systems (OCEMS) OCEMS were installed and connected to coal-fired boilers at Dahej, Kurkumbh, and Patalganga plants, with systems at Dahej linked directly to GPCB and CPCB portals for real-time data transmission, ensuring continuous monitoring and regulatory compliance across all sites. Completed OCEMS rollout across all major sites, strengthening FY 2024-25 compliance framework
Unit - tCO₂e Unit 2024-25 2023-24 2022-23
Scope 1 Emissions tCO₂e 360,680.00 353,846.00 -
Scope 2 Emissions MTCO₂e 24,352.00 32,261.00 -
Scope 3 Emissions MTCO₂e 293,070.00 253,378.00 -
Emissions Intensity Metrics
Scope 1+2 tCO₂e/INR turnover Scope 1+2 tCO₂e/INR turnover 0.00 2.41 -
Scope 1+2 tCO2e/MT output Scope 1+2 tCO2e/MT output 2.18 0.43 -
Scope 3 tCO₂e/INR Scope 3 tCO₂e/INR 0.00 1.58 -
Air pollutants
NOx Emissions (µg/m3) µg/m3 19.00 27.00 -
SOx Emissions (µg/m3) µg/m3 21.00 19.00 -
Particulate Matter (µg/m3) µg/m3 77.00 70.00 -
Volatile Organic Compounds (ppm) ppm 1.24 4.30 -
PRODUCT STEWARDSHIP

By 2030, the business is to finish the Life Cycle Assessment (LCA) studies for twelve high-risk goods. By this fiscal year, the corporation has finished the life cycle assessment (LCA) of every high-risk product from the first LCA conducted in 2019–20. The business has already achieved the goal. Additionally, the company has conducted research and development to employ recycled materials through ongoing process re-engineering.

NATURAL CAPITAL

Plantation of trees both inside and outside the factory grounds . The unit has created a 94,731 m2 green belt at Kurkumbh and planted more than 17,342 different plant types. In Dahej, the unit has created a green belt on 22,000 m2 of land within the plot and leased an adjacent piece of property from GIDC to create a greenbelt on 35,622 m2 and about 6,768 different species of trees planted. The unit in Patalganga has created a 5,010 m2 green belt within the plot and planted more than 203 different plant types.

CSR FOR CLIMATE ACTION

The goal of Alkyl Amines is to have a zero operating footprint. They have coordinated a number of projects that include solar energy, tree plantations, excavation, restoration and cleaning of water bodies, and water conservation.

Unit - Cr INR Unit 2024-25 2023-24 2022-23
CSR Budget Cr INR 5.50 6.80 -